Form code: F-06 Project: …… | Electrical inspector: …… | Date: ……

This form is prepared for registration of inspection by a qualified person. The basis of the review should include the approved design, site requirements and standards related to the fountain facility and facility testing. IEC 60364-7-702 [443], IEC 60364-6 [444]

6–1. Documents and safeguards

row

under review

the result

evidence or action

1

The single-line map and circuit list are available and up-to-date

……

……

2

The electrical zoning of the basin and its surroundings is clear

……

……

3

The equipment is compatible with the installation area and type of access

……

……

4

The protection method of each circuit is clear and traceable

……

……

5

Cables are suitable for installation conditions and environment

……

……

6

Overload and short circuit protection is integrated with the circuit

……

……

7

The RCD type is compatible with the load and the drive in the relevant circuits

……

……

8

Motor protection is set to specifications

……

……

9

A proper isolator is provided for the intended service

……

……

10

The ground connection and alignment have been implemented according to the plan

……

……

11

PE continuity of Class I equipment is checked

……

……

12

SELV circuit isolation and wiring requirements are met

……

……

13

The location of the transformer and power supply is compatible with the area restrictions

……

……

14

Connections, glands and boxes are suitable for environmental conditions

……

……

15

Water penetration, corrosion and insulation damage have not been observed

……

……

16

Circuit signs and necessary warnings are legible

……

……

17

The emergency stop and the logic to prevent unwanted start-up have been reviewed

……

……

18

There is an energy locking method for repairs

……

……

6–2. Exam registration table

test

Circuit or equipment

Measurement result

Acceptance and reference criteria

accept/reject

Continuity of protective conductor

……

…… Ohm

……

……

Continuity of related conjunctions

……

…… Ohm

……

……

Insulation resistance

……

…… megaohm

……

……

Automatic power cut-off conditions

……

……

……

……

Differential current device test

……

Stream/Time: ……

……

……

Checking the ground connection system

……

……

……

……

Output voltage source and load location

……

…… volts

……

……

Polarity and phase sequence, as applicable

……

……

……

……

Protection performance test

……

……

……

……

ID of the test device: …… Calibration validity date: ……

The insulation test must be performed following the manufacturer's instructions and isolating sensitive electronic equipment. A single value such as "Earth resistance less than a specified number" for all types of systems is not a substitute for checking the protection method and disconnection conditions.

6–3. Three tips to avoid misconceptions

1. IP68 does not mean unlimited protection. Manufacturer's declared immersion conditions, depth, connections and installation method should be checked; This sign alone is not a proof of electrical safety of the complex. IP classification standard [445]

2. RCD is not a substitute for other protections. Its type, sensitivity, operation time and coordination with the load should be determined in the design.

3. Low voltage alone does not cause SELV. Protective isolation, power supply, wiring and connections to other circuits are also important.

Final decision: approval □ approval after modification □ disallowing electrification of the specified section □

Description and signature of the person in charge: ……

Notes and references

  1. Source 46: IEC 60364-7-702; webstore.iec.ch. Full address in the bibliography.

  2. Source 138: IEC 60364-6; webstore.iec.ch. Full address in the bibliography.

  3. Source 299: IP Classification Standard; webstore.iec.ch. Full address in the bibliography.

About this edition

The supplied book has been transferred into website pages, including tables, equations and footnotes. The initial translation was machine generated, with terminology corrections and sample checks; a complete human technical review has not yet been performed. The diagrams have been recreated for the web with labels in the selected language.