Water changes the way a place feels.+964 750 410 7076
IRAQFOUNTAIN
All chapters
LIBRARY · FULL TEXT

Monthly inspection checklist

Read directly in English2 min read2 tables

Monthly inspection checklist

Form code: F-05 Project: …… | Month: …… | Inspector: ……

Monthly inspection complements daily controls and equipment service instructions. The shorter interval prescribed in the manufacturer's manual or water management plan still applies.

row

Subject of inspection

the result

Action or report number

1

Cracks, subsidence, breaks or damage to the edge of the pool

……

……

2

Pool leaks, pipes and fittings

……

……

3

Cleanliness of waterways, overflow and salt floors

……

……

4

The health of the grating, valve and their connections

……

……

5

The condition of the suctions and the absence of obstruction

……

……

6

Cleaning and adjustment of nozzles

……

……

7

Stabilization of rims and equipment base

……

……

8

Abnormal noise, vibration or pump leakage

……

……

9

Comparison of flow and pressure with base values

……

……

10

Filter pressure difference and washing records

……

……

11

Condition of injection equipment and material leakage

……

……

12

Level sensor performance and related test recording

……

……

13

Anemometer status and wind dependent control

……

……

14

Visible health of lights and cables

……

……

15

Moisture, corrosion or unusual heat effects of the panel

……

……

16

Ventilation, lock and panel access

……

……

17

Checking the report of control and drive errors

……

……

18

Accuracy of clock, schedule and backup

……

……

19

The situation of slippery and stagnant water around

……

……

20

Readability of signs and access to emergency equipment

……

……

21

Water quality records and corrective actions

……

……

22

Inventory and consumption date of materials and parts

……

……

23

Comparison of water and electricity consumption with similar periods

……

……

24

Registration of complaints and user feedback

……

……

Registering the indicators of the month

Indicator

amount

Scheduled working hours

…… hours

Actual working hours

…… hours

Stop due to failure

…… hours

Stoppage due to environmental conditions

…… hours

electricity consumption

…… kilowatt-hours

Make-up Water

…… cubic meter

The cost of repair and consumables

……

Recurring failure

……

Inspector's decision: continue operation □ continue with certain restrictions □ stop defective part □ complete stop □

Limitation or reason for stopping: …… Follow-up person: …… Review date: ……

About this edition

The supplied book has been transferred into website pages, including tables, equations and footnotes. The initial translation was machine generated, with terminology corrections and sample checks; a complete human technical review has not yet been performed. The diagrams have been recreated for the web with labels in the selected language.