Control equipment reference

Read directly in English20 min read17 tables

Control equipment reference

Switchboard, PLC, DMX controller, RDM management, inverter, sensors, relays and protection equipment

The control equipment transforms the movement of water and light into a coordinated program. Starting the show, changing the height of the fountains, combining colors, compensating for water level drops and reacting to wind or equipment failure are all dependent on this section.

In addition to performing the show, the appropriate control system should determine the condition of the equipment, provide the possibility of maintenance, and have a defined reaction in abnormal conditions. A large number of channels or software features, without coordination with pumps, lights, sensors and protection circuits, does not guarantee optimal performance.

According to the initial list of the book, this chapter introduces the eight main groups of control equipment and provides criteria for selecting and recording their specifications.

Product information note: The specifications of the samples are extracted from the official pages of the manufacturers. Incomplete or inconsistent information has been identified. In the final order, the model, hardware and software version, accompanying equipment and connection plan must be determined.

61–1. The structure of the fountain control system

Fountain control tasks can be divided into three groups:

group of tasks

Performance example

Related equipment

Performance of the show

Harmony of water, light and music

Display controller, software, DMX network

Operation control

Timing, level control, error recording

PLC, sensors, operator interface

Protection and safety

Prevent unauthorized operation and stop danger

Protective equipment and safety circuit suitable for the project

These tasks may be implemented in several independent devices or in an integrated system; But the responsibility of each task must be clear.

For example, the display software can issue the command to increase the height of the fountain, but allowing the pump to start must be adapted to the state of the water level, the readiness of the drive, and other necessary conditions.

The usual direction of command

The display program sends the command to the controller; The controller communicates with the light driver, inverter or valve starter through the appropriate interface. At the same time, sensors and power equipment provide status information back to the operating system.

The presence of the "on" command in the software alone does not prove that the pump is actually working or that the water flow is established.

Figure note from the source manuscript

Instead of Figure 61–1

Connection schematic of display controller, PLC, light driver, inverter, valves and sensors. Power, command and feedback paths are displayed with three different colors.

61–2. electrical panel; Complete set specifications

The switchboard is the place of energy distribution, installation of power equipment and organization of command and protection circuits. Its quality depends on the choice of parts, internal arrangement, wiring, heat dissipation and quality of construction.

At least the following items should be recorded in the specifications of the board:

subject

Required information

feeding

Voltage, frequency, number of phases and grounding system

Capacity

Nominal current of the set and output circuits

short circuit

Specifications of bearing set and breaking strength of equipment

Installation environment

Inside or outside the building, temperature, humidity and the possibility of flooding

compartment

Material, coating, degree of protection and cable entry method

Heat control

Losses of equipment and methods of ventilation or cooling

Command circuits

Command voltage, power sources and how to separate

maintenance

Access, tagging and service space

Development

Physical space and projected capacity

Documents

Drawings, parts list and test report

The IEC 61439 family deals with the requirements for low pressure switchgear assemblies. The first part states the general rules and should be used together with the part related to the type of board; Compliance of individual parts alone does not prove compliance of the complete board. Source: IEC 61439-1:2020 [411]

heat dissipation

To estimate the thermal load of the panel, the actual losses of inverters, power supplies and other equipment are added:

Ploss,total=∑ Ploss,i

This value is different from the total nominal power of the motors connected to the panel. Ambient temperature, sunlight, chamber dimensions and installation conditions also have an effect on the choice of cooling method.

The degree of protection declared for the enclosure must be maintained in the assembly design after installing the fan, filter, gland and other components.

61–3. PLC; Operation controller

A PLC receives inputs, executes the program logic and gives the appropriate output. In the fountain, its common uses are:

• Reviewing the permitted conditions for launching;

• Tank filling control;

• Coordinating display and purification pumps;

• Obtain wind, pressure and flow conditions;

• Manual and automatic mode management;

• Recording warnings and working hours.

PLC selection criteria

characteristic

choice question

Digital input

How many intermittent signals are received?

Digital output

What is the output type and capacity?

Analog input

What signals are read, with what accuracy?

Analog output

How many consecutive commands are required?

Communication

What protocols do the equipment use?

response time

What is the allowable delay for each task?

Development

What modules can be added?

maintenance

How are the app, backups, and setup tools delivered?

4-20mA input, 0-10V input and dry contact are not directly interchangeable. Relay and transistor output also have different behavior and capacity.

Normal PLC and safety PLC

For tasks that require safety performance, appropriate architecture and equipment should be selected. Simply having a normal PLC or writing a stop condition in the program does not make the circuit a certified safety system. Industrial manufacturers such as Siemens offer family-specific controllers and safety I/Os. Source: SIMATIC Safety Integrated [412]

61–4. Preparation of input and output list

Before choosing the controller model, the input and output list or I/O List should be prepared.

Sample ID

signal

type

Application

DI-01

Very low tank level

Digital

Prevent related pump operation

DI-02

Top level of the tank

Digital

End of filling command

DI-03

Inverter ready

Digital

Checking the possibility of launching

DI-04

Inverter error

Digital

Logging and responding to failures

AI-01

wind speed

analog

Limit or stop viewing

AI-02

line pressure

analog

Hydraulic condition monitoring

DO-01

Filling valve steering wheel

Digital

Compensation for water loss

DO-02

Pump work permit

Digital

Setup according to logic

AO-01

Pump speed reference

analog

Round adjustment, if used

The signal type in the table is a design example and should be adapted to the actual output of the equipment. Speed ​​command may be transmitted via network instead of analog output.

For each signal, the normal state, the error state, the behavior when the cable is disconnected and the location of the terminal should also be recorded. Capacity reservation should be determined based on the likely development of the project.

61–5. DMX controller; Capacity and how to use

DMX is used to transmit display commands to compatible equipment. Each DMX universe has a maximum of 512 data channels with 8-bit resolution. Each device consumes one or more channels depending on its working mode. Source: DMX glossary in ETC [413]

Therefore, the term "512 channel controller" does not mean independent control of 512 devices.

Example of capacity calculation

Suppose the project includes the following equipment:

hypothetical equipment

number

channel of each unit

total

The light is in six-channel mode

40

6

240

Pump in dual channel mode

20

2

40

Tap in single channel mode

24

1

24

plural

304 channels

In terms of the number of addresses, this arrangement fits in one universe; But the number of branches, electrical capacity of the network, distances and controller facilities should be checked separately.

Also, the number of sockets or output lines is not necessarily equal to the number of independent universes. They may have multiple outputs, same data or common capacity.

Addressing table

For each device, the universe, starting address, number of channels and the function of the channels must be specified. Two devices with a common address receive the same commands if the working mode is compatible; For independent control, they must have independent address allocation.

61–6. DMX network cabling and division

In the conventional wired DMX network, the equipment of each branch is connected in a chain. Inactive branching of Y can reduce communication reliability. The end of the line should also be terminated according to the instructions with proper termination, usually 120 ohms between the two data lines. Source: DMX512 manual in ETC [414]

A suitable splitter is used to divide the path. The following should be checked in its specifications:

• number of inputs and outputs;

• electrical isolation of branches;

• RDM support, if needed;

• Cable condition and route length;

• environmental protection;

• Behavior when there is a power outage or a branch failure.

Light power amplifier and DMX data splitter are two different devices. The first one is related to the load current and the second one is related to the control signal distribution.

61–7. RDM; Management of equipment on the network

RDM provides two-way communication over the DMX network. Its uses can include device identification, setting the start address, and receiving status or errors. The ANSI E1.20-2025 standard describes this communication method. Source: Introduction of RDM standard in ESTA [415]

The title "RDM Controller" should be interpreted strictly. RDM is usually the management capability of a DMX system and not necessarily a standalone device to run the show.

Ability

Terms of use

Discover equipment

Controller and device support

Address setting

Device and software support

Retrieving information

The presence of the relevant parameter in the device

Error report

Error message definition and support

Pass through the splitter

Splitter compatibility with two-way communication

The presence of RDM does not mean that all quantities can be read. For example, receiving the temperature of the device is possible only when its hardware and software support this data.

61–8. Inverter or variable speed drive

The inverter controls the speed of the motor and thus the pump performance is changed. Its selection should be done according to the engine specifications and display requirements.

characteristic

Review criteria

input

Voltage, number of phases and frequency

output

Rated current and overload capacity

engine

Type, voltage, current and control method

command

Digital, analog or network input

speed change

Acceleration and deceleration time

Motor cable

Length, type and need for filters

the environment

Temperature, installation height and capacity reduction

Feedback

Ready status, error, current and speed

protection

Drive facilities and additional equipment

The power listed on the inverter alone is not a sufficient criterion. Rated motor current, type of load and thermal conditions must be adapted to the usable capacity of the drive.

Two executive points

Connecting and disconnecting the contactor between the inverter and the motor while feeding the motor can damage the equipment. If there is such a contactor in the design, the sequence of operation should be according to the instructions of the same drive. Source: Schneider Electric manual [416]

Also, the STO or "Safe Torque Off" function is not equivalent to electrical isolation. The ABB manual specifies that STO does not interrupt the voltage of the main and auxiliary circuits of the drive. Source: ACS580-01 manual [417]

For a pump with an internal controller or DC motor, the approved control method of the same product must be used.

61–9. sensors; Information needed to make a decision

The sensor must measure a quantity that is meaningful for project control.

Sensor

Application

Key specifications

Point surface

Detection of water reaching a certain level

Output status, hysteresis and installation method

continuous surface

Level measurement

Amplitude, accuracy and signal type

the wind

Out-of-bounds spray management

Domain, response time and installation location

pressure

Monitor line or pump performance

Amplitude, surge tolerance and connection

water flow

Circulation verification or flow measurement

Detection limit and installation conditions

temperature

Monitoring the board, water or equipment

Scope and place of measurement

Leakage or flooding

Announcing the entry of water into the facility

Detection method and behavior in error

Level control

At least these situations should be distinguished from each other:

1. Normal level; 2. Dewatering start level; 3. Dewatering end surface; 4. Too low level to prevent the pump from working; 5. Abnormally high level, if needed.

The levels must be in harmony with the necessary depth of the pump, the volume of the tank and the oscillation of the fountain. The distance between the start and end of water extraction and the appropriate delay prevent frequent interruptions caused by waves.

Wind control

The height reduction threshold and the stop threshold should be determined from the actual spraying conditions, the shape of the nozzle and the scope of the project. A fixed number is not suitable for all fountains. Delay and threshold difference should also be taken into account to return to the display.

61–10. Relays, contactors and power outputs

The output of the controller does not provide the necessary power for any type of consumer directly. Depending on the load, an interface relay, contactor or electronic starter may be required.

equip

Application

Selection criteria

Intermediate relay

Command transmission and circuit matching

Coil voltage, contact type and capacity

contactor

Disconnecting and connecting the power circuit

Load type, workflow and number of operations

Solid state relay

Compatible electronic disconnects

AC or DC output, losses and cooling

milk launcher

Milk bobbin control

flow, type of stimulation and speed of response

Safety relay

Implementation of a specific safety task

Architecture and required performance level

The stated capacity for a resistive load should not be extrapolated to a coil or motor without checking.

For induction coils, the transient voltage suppression method should be selected according to the circuit. In fast valves, the type of braking circuit can change the spool release time; Therefore, its coordination with the timing of the show is important.

A regular relay is no substitute for an LED driver for fast and continuous light changes.

61–11. Protective equipment

Protective equipment must be selected in accordance with:

Equipment or performance

role

Isolator key

Isolation of the circuit for specific work

Fuse or protection switch

Proportional protection against overcurrent and short circuit

Motor overload protection

Thermal protection tailored to the engine

Residual current protection

Performance according to the electric shock protection scheme

Transient overvoltage protection

Limiting transient overvoltages

Phase and voltage monitoring

Diagnosis of poor nutritional status

DC source protection

Limiting the consequences of short circuiting of branches

Safety stop circuit

Bringing the system to the designated state

In the circuit with inverter, the type of residual current protection should be compatible with the fault current shape and the manufacturer's instructions. Schneider Electric explains the suitability of type B for three-phase drives; This issue should not become the same choice of sensitivity and type of protection for all projects. Source: RCD and three-phase drives [418]

For the electrical installation of the fountain basin and its surrounding area, IEC 60364-7-702 is one of the relevant references. Implementation requirements should be adapted to the applicable regulations of the project location and the type of people's access to water. Source: IEC 60364-7-702 [419]

61–12. Control equipment introduced in GSO

A) DMX data readers

The following two products are introduced in the GSO list:

Published name

Product code

Data Reader-3Ch-5A

647

Data Reader-4Ch-4A

805

The family page introduces receiving DMX commands and controlling outputs. However, in the explanation of the four-channel model, the term three channels is also seen; Therefore, the number of output and current of each channel must be confirmed with the technical sheet of the same model. Source: GSO data readers [420]

In the order, the voltage, type of output, current of each channel, total allowed current, addressing method, RDM support and behavior during data interruption should be specified.

b) SW.DW level sensor

SW.DW product with code 449 has been introduced for level control and coordination of drainage and overflow. In the table of the site, one inch fresh water connection, two inch overflow and 304/316 material are mentioned. The type of electrical output and the final grade must be specified in the order; Mechanical adjustment numbers should also not be considered equivalent to measurement accuracy. Source: SW.DW in GSO [421]

c) 4000 level control package

characteristic

Published information

Product code

450

Sensor voltage

24 volts; AC/DC type is not specified in the table

The degree of protection listed

IP68

Inserted gender

316 steel

The working temperature is listed

4 to 60 degrees Celsius

Level adjustment values are not the same in text and page table. Adjustment range, accuracy, signal type and immersion conditions should be verified before operational use. Source: Level 4000 control package [422]

61–13. OASE reference sample

The WECS III 1024/DMX/02 controller is an example of a dedicated water and light display controller.

characteristic

Declared amount

Product code

84967

feeding

24 volts DC

Maximum power consumption

10 watts

DMX/RDM capacity

1024 channels

Number of DMX/RDM lines

4

Isolated digital input

8

Isolated digital output

8

Working temperature

Zero to 40 degrees Celsius

Facilities

Calendar, Ethernet, USB and microSD

Source: official specifications of OASE WECS III 1024 [423]

This example shows that four physical lines do not necessarily mean four independent universes with full capacity; The declared total capacity of this model is 1024 channels. How to allocate lines and limits of digital outputs should be extracted from the instructions of the same version.

61–14. Crystal Fountains reference sample

The LEDPS300 family is introduced to control the display and some peripheral functions of the fountain.

characteristic

Declared information

Display capacity

1024 channels in two DMX universes

Inputs

16 input signals

Outputs

16 dry contact relays

Analog steering wheel

Ability to control two VFD drives

timing

Clock and calendar

Working temperature

Zero to 50 degrees Celsius

compartment

NEMA 4

Source: Crystal LEDPS300 [424]

A dry contact is not a motor power source and must be matched to the appropriate power circuit. Also, NEMA 4 should not become a definitive equivalent IP code without examining the scope of the tests. Power configuration and contacts capacity must be specified for order model.

61–15. Error reaction logic

Prepare a "cause and action table" for each project. The following table is an example for developing the logic and should be adapted to the final design.

event

Action under review

return condition

Very low level

Stopping dependent pumps and reporting errors

Level recovery and start-up conditions fulfilled

strong wind

Decreasing height or stopping the relevant group

Steady decline in wind

A drive error

Stop the dependent group and record the cause

Error correction and reset allowed

Display disconnection

Execute predefined status

Return communication and readiness check

Abnormally long dehydration

Interruption of filler command and warning

Check the cause

Flooding of the board space

Protective action according to the plan

Fix the situation and confirm the person in charge

Power return

Remaining in the designated state

Check the conditions and start-up license

The appropriate state for disconnection is not necessarily to send zero to all channels; The meaning of zero in the channel map of each device must be known.

Nor should the operator's manual mode render essential safeguards ineffective. Each mode of service must have certain limits and responsibilities.

61–16. Settings, access and backup

The system delivery file must include the following:

• PLC program and usable project file;

• display files and necessary software version;

• Map of DMX and network addresses;

• Settings of inverters;

• List of thresholds and delays of sensors;

• Backup and recovery method;

• Operator and administrator access levels;

• Error list and action guide.

Settings affecting safety and equipment limitations should be separate from the operator's daily editing. If remote access is anticipated, the method of connection, authentication and change logging should also be part of the delivery specification.

61–17. Testing and acceptance of control equipment

Factory test checks board and logic function before installation. Project site testing verifies their relevance to actual equipment and conditions.

stage

Sample review

Check documents

Matching parts, maps and settings

Entrance test

Correct display and interpretation of each sensor

Test outputs

The function of the equipment corresponding to the command

Show test

Addressing, color, height and coordination

crash test

Data interruption, drive error and signal loss

Restart test

Behavior after power cut and return

Protection test

The approved method and criteria for the relevant circuit

Recovery test

Restore backup program and settings

Error tests should be performed in a controlled manner; The pump does not need to be intentionally run without water to demonstrate dry-run protection functionality. The input and related logic can be simulated according to the approved test method.

Record each result with test ID, initial state, action, expected result, and actual result.

61–18. Pictures and suggested documents of the chapter

No

Suggested content

explanation

61–1

Control system architecture

Separation of power, command and feedback

61–2

Interior view of GSO panel

Naming the power and control parts

61–3

Controller and communication equipment

Real photo with product code

61–4

DMX/RDM network

Branches, splitters and ends of lines

61–5

Installing the level sensor

Levels and service availability

61–6

Operator page

Pump status, level, wind and error

61–7

Sample exam paper

A completed and trackable test

Board and equipment images should be selected from real archives. An instructional schematic can be prepared to explain the connections; The wiring diagram, number of terminals and protection settings should be extracted from the approved engineering documents of the project.

Note to complete the printed version: In the GSO products section, complete the final specifications of the data readers, the signal type of the level sensors, the IP68 conditions and the items included in each package. A project-oriented selection sheet should also be included for the panel, PLC, and inverter, so that the capacities and settings of a project are not taken as fixed specifications of all fountains.

Notes and references

  1. Source 137: Source: IEC 61439-1:2020; webstore.iec.ch. Full address in the bibliography.

  2. Source 279: Source: SIMATIC Safety Integrated; www.siemens.com. Full address in the bibliography.

  3. Source 280: Source: DMX Glossary in ETC; www.etcconnect.com. Full address in the bibliography.

  4. Source 183: Source: DMX512 Guide at ETC; support.etcconnect.com. Full address in the bibliography.

  5. Source 281: Source: Introduction of RDM standard in ESTA; tsp.esta.org. Full address in the bibliography.

  6. Source 282: Source: Schneider Electric Manual; www.se.com. Full address in the bibliography.

  7. Source 283: Source: Manual ACS580-01; library.e.abb.com. Full address in the bibliography.

  8. Source 284: Source: RCD and three-phase drives; www.se.com. Full address in the bibliography.

  9. Source 46: Source: IEC 60364-7-702; webstore.iec.ch. Full address in the bibliography.

  10. Source 285: Source: GSO Data Readers; gsofountain.com. Full address in the bibliography.

  11. Source 286: Source: SW.DW in GSO; gsofountain.com. Full address in the bibliography.

  12. Source 287: Source: Level 4000 Control Package; gsofountain.com. Full address in the bibliography.

  13. Source 288: Source: OASE Official Specification WECS III 1024; www.oase.com. Full address in the bibliography.

  14. Source 289: Source: Crystal LEDPS300; crystalfountains.com. Full address in the bibliography.

About this edition

The supplied book has been transferred into website pages, including tables, equations and footnotes. The initial translation was machine generated, with terminology corrections and sample checks; a complete human technical review has not yet been performed. The diagrams have been recreated for the web with labels in the selected language.